A new elementary school is under construction in the Village 8 area of Daybreak in South Jordan (located at approximately 11189 South Willow Walk Drive). This school is anticipated to open for the 2021-22 school year. The school boundary will include parts of the current boundary of Bastian Elementary and undeveloped areas currently in the Golden Fields Elementary boundary.
Boundary Option Video | Option Comparison Slider Map | Building Capacity and Current Enrollment | Projected Enrollment
Boundary Option Video
Option Comparison Slider Map
Building Capacity and Current Enrollment
Building Capacity | Current Enrollment | |
Bastian Elementary | 1000 | 969 |
New Village 8 | 875 (projected) |
Projected Enrollment
The table below shows the projected enrollment for Bastian Elementary if no new elementary school were to be constructed.
2021-22 | 2022-23 | 2023-24 | 2024-25 | 2025-26 | 2026-27 | |
Bastian | 1166 | 1375 | 1593 | 1953 | 2174 | 2336 |
These tables show the projected change in enrollment for both Bastian Elementary and the Village 8 elementary under both Option A and Option B.
Option A | 2021-22 | 2022-23 | 2023-24 | 2024-25 | 2025-26 | 2026-27 |
Bastian | 648 | 719 | 819 | 998 | 1142 | 1264 |
New Village 8 | 518 | 657 | 774 | 955 | 1032 | 1072 |
Option B | 2021-22 | 2022-23 | 2023-24 | 2024-25 | 2025-26 | 2026-27 |
Bastian | 620 | 655 | 732 | 886 | 1038 | 1160 |
New Village 8 | 546 | 720 | 861 | 1067 | 1135 | 1176 |
Return to the introduction page for Frequently Asked Questions and the survey link.